Flowline and Pipeline Construction

By Bucking

We use bucking machine to connect the joints to each other by coupling (Pin & Box), and then  Applying torque to the required value, and Ensure no leakage will occur in the future, Or during hydro test

By Welding

We use welding machines and fabrication methods to connect the joints to each other by butt weld.

Fabrication is used to produce shapes required.

After finishing connecting process a hydro test will be done to ensure no leakage found.

They provide EPIS with additional equipment and human resources back – up at a short notice, to handle very complex and highly technical jobs.

The prime objective of any pipeline division is to provide for safe and efficient operation. EPIS’s leak detection and location application guarantees these objectives. Our data acquisition devices & applications helps in pipeline operation and registers all abnormal imbalances and notifies the operator in case of an anomaly. The operator has all the tools necessary to quickly and accurately pinpoint the problem.

EPIS has developed various methods of leak detection that address the requirements of specific pipeline operation. These procedures are independent from one another and can be implemented alone or in combination with others.